Arizona Asbestos NESHAP Regulations for Demolition and Renovations
Arizona Asbestos NESHAP Regulations for Demolition and Renovations
A pdf page outlining the asbestos NESHAP regulations for contractors in Arizona
Renovations — Facilities undergoing renovations
must submit a NESHAPs notification if greater than
threshold amounts of RACM are disturbed.
Threshold amounts are:
• 260 linear feet (for materials on pipes)
• 160 square feet (for surface areas)
• 35 cubic feet (for materials
What everyone needs to remember when considering demolition or renovations of a facility is that NESHAP’s applys to All facilities, regardless of the date of construction.
If the project is in Maricopa County the following applies:
Thoroughly inspect the facility within 12 months of commencement of demolition or renovation activity. Include the date of this inspection on the written notification. *(All facilities, regardless of the date of construction)
http://www.azdeq.gov/environ/air/asbestos/download/neshap_demo.pdf