A pdf page outlining the asbestos NESHAP regulations for contractors in Arizona

Renovations — Facilities undergoing renovations


must submit a NESHAPs notification if greater than
threshold amounts of RACM are disturbed.
Threshold amounts are:
• 260 linear feet (for materials on pipes)
• 160 square feet (for surface areas)
• 35 cubic feet (for materials

What everyone needs to remember when considering demolition or renovations of a facility is that NESHAP’s applys to All facilities, regardless of the date of construction.

If the project is in Maricopa County the following applies:

 Thoroughly inspect the facility within 12 months of commencement of demolition or renovation activity. Include the date of this inspection on the written notification. *(All facilities, regardless of the date of construction)

 

http://www.azdeq.gov/environ/air/asbestos/download/neshap_demo.pdf